Fast on the rails

As a fast alternative our rail transport is available to you. Our rail network links the seaports with the terminals along the waterways and the combined terminals in the German hinterland, Eastern and Southern Europe.

Schedules

Train Timetable Rotterdam View Download
Holiday schedule 01 May 23.04.2021-10.05.2021 View Download
Holiday schedule Corpus Christi 07.05.2021-15.05.2021 View Download

Contargo’s Rail Activities

Contargo terminals now have the following rail links:

Contargo Süd

Basel

  • Antwerp
  • Hamburg and Bremerhaven
  • Rotterdam

Inter Switzerland

  • Chavornay/Geneva: Rhine-Rhône-Shuttle
  • Monthey
  • Gossau: Ostschweiz Shuttle

Weil

  • Antwerp
  • Hamburg and Bremerhaven
  • Rotterdam

Ottmarsheim

  • Rotterdam

Strasbourg

  • Antwerp
  • Rotterdam

Contargo Wörth-Karlsruhe

Wörth

  • Hamburg and Bremerhaven
  • Rotterdam

Contargo Rhein-Neckar

Mannheim-Ludwigshafen

  • Hamburg and Bremerhaven
  • Rotterdam

Contargo Rhein-Main and Contargo Industriepark Höchst

Frankfurt-Ost

  • Hamburg

Frankfurt-West

  • Rotterdam

Contargo Neuss

Neuss

  • Rotterdam

DIT Duisburg

  • Antwerp
  • Rotterdam
  • Several by cooperation partners

Contargo Combitrac

Hof

  • Bremerhaven
  • Hamburg

Glauchau

  • Bremerhaven
  • Hamburg

Wiesau

  • Bremerhaven
  • Hamburg

Cooperation partners

Rail links to Hamburg and Bremerhaven on demand via

  • Augsburg
  • Munich
  • Nuremberg
  • Stuttgart - Kornwestheim
  • Ulm

The trains are supplied by various train operators.


One tonne of goods needs the same amount of energy to travel:

Water levels

26 Jan 2022

Kaub 165 +3
Ruhrort 370 -12
Emmerich 219 -9

LWS information here

Energy surcharge

BAF Index

01/2022
17
02/2022
16

More Information here

TTFS Index

01/2022
6
02/2022
5

More Information here

Copyright © CONTARGO. All Rights Reserved.