27 Jan 2016

Mannheim Terminal back at full strength

As of yesterday afternoon, Crane 3 at the Rhein-Neckar GmbH site in Mannheim is fully operational again following a lengthy major repair.

As a result operations at the terminal are once more back to normal.

Back

Copyright © CONTARGO. All Rights Reserved.