Construction work by DB Netz on the line between Koblenz and Mainz
Due to numerous construction and maintenance measures along the rail lines left and right of the Rhine, particularly along the section between Koblenz and Mainz, only limited line capacities are available in the time between January and probably the end of April 2019.